Skip to main content

Location

The projects are located in Morona Santiago, near the Gualaquiza canton.

Strategic Location and Mining Environment

The projects are located in a world-class district, surrounded by successful operations and proven deposits.

  • 50 km from Fruta del Norte (Lundin Gold): Project with an investment of $800 million and production of 300,000 ounces of gold annually.
  • 25 km from Mirador (Ecuacorriente): Active mine with resources of 7.8 billion pounds of Cu and 3.2 million ounces of Au. Its projected expansion will reach 140,000 tons per day by the end of 2025.
    25 km from San Carlos and Panantza: Deposits hosting combined reserves in excess of 14.4 billion pounds of Copper.
  • 30 km from Warintza: Major deposit with resources of 1.5 billion ounces of Cu.

WHY NOW? IN THE RIGTH PLACE AT THE RIGTH TIME

  • when the Gold price was $US695/Oz; Copper price was $US6,586/T; Silver price $US13/Oz. TODAY, the  Gold  price  is +$US3,000/Oz;  Copper  price  is +$US9,500/T; Silver price is +$US31/Oz.
  • South East Ecuador confirmed as No.1 area to discover major mines in Ecuador + “Know How” of discovery  controls  for  major  deposits,  markedly reducing the exploration risk profile.
  • Strong  Support  of  President  Executive  and Federal Congress for Major Mine Development

Our Projects

We offer a solid opportunity for near-term gold production, prioritizing social responsibility and environmental sustainability throughout our operations. Our portfolio consists of three strategic projects:

  1. 1. Tarqui | Advanced Exploration: This is our most advanced project. Trenches are currently being constructed to monitor hydrothermal veins, and a 20,000 m drilling grid is planned.

  2. 2. Arenal | Initial Exploration: Reconnaissance phase encompassing sediment and outcrop sampling, along with overburden and vein monitoring.

  3. 3. Quimi | Exploration Initial: Project focused on prospecting by sampling sediments, soils and outcrops.

Preeliminary conceptual Bulk Targets